Following quiz provides Multiple Choice Questions (MCQs) related to SAP PP. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.

Questions and Answers

Q 1 - In Production Planning, which of the following is first step to start Production process?

A - Production order confirmation

B - Issuing goods for production order

C - Converting planned order to Production Order

D - Issue the production order

Answer : C

Explanation

Converting planned order to Production Order −

First step is to convert a planned order to production order. When you create a Production Order, type is defined in SAP PP system.

Q 2 - In PP, which of the following is not a valid category for BOM?

A - Material BOM

B - Equipment BOM

C - Cost BOM

D - Inspection BOM

Answer : D

Q 3 - To create routing it is mandate that you first define work center?

A - True

B - False

Answer : A

Q 4 - For Make to Order process, which of the following Planning strategy is used?

A - 20

B - 25

C - 30

D - 35

Answer : A

Explanation

You use Planning strategy 20 for make to order MTO process and planning strategy 25 is used to produce product variants when there is request for variant products from customer

Q 5 - Which of the following movement type is used to transfer Posting to storage location?

A - 301

B - 302

C - 305

D - 311

Answer : D

Q 6 - Using T-Code CO01, you can create a Production order without referring planned order?

A - True

B - False

Answer : A

Explanation

Answer : B

Explanation

NetChange in planning horizon −

This run considers the requirement in predefined planning horizon and not like net change which check the future requirements.

In this run, system consider only those material which has undergone some changes from their last MRP run.

Answer : C

Explanation

Good receipt is performed when material is produced as per Production order and goods is placed at storage location. The stock quantity is increased and movement type 101 is entered.

Answer : A

Q 10 - Which of the following Transaction can be used confirm a Production Order and for Goods movement?

A - CO01

B - CO02

C - CO15

D - MD16

Answer : C

Explanation

To confirm Production Order, use T-code: CO15

You can perform following activities −

  • Generate confirmation document
  • Consume raw materials or semi-finished goods
  • Good receipt of finished goods or semi-finished goods