SAP QM Online Quiz



Following quiz provides Multiple Choice Questions (MCQs) related to SAP QM. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.

Questions and Answers

Q 1 - Under quality control, you have quality notifications, standard reports and Quality notification system. What actions has to be taken as per defect finding?

A - True

B - False

Answer : A

Q 2 - Which of the following is not a control parameter that can be set on the material master for Quality Management?

A - MRP Type

B - Inspection Type

C - Sample Determination

D - Requirements for the vendor’s QM system

Answer : A

Q 3 - Which of the following in QM is used to determine the size of inspection lot to be used in inspection plan under Quality planning?

A - Master inspection charactertics

B - Inspection Method

C - Sampling Procedure

D - None of these

Answer : C

Explanation

Sampling procedure in QM is used to determine the size of inspection lot to be used in inspection plan under Quality planning. You can define a sampling procedure as fixed sample, percentage or other sample. A sampling scheme contains collection of sampling plans.

Answer : D

Explanation

QMP stands for Quality Management Plan

Q 5 - If you want that the sample size will not be dynamically modified, which of the following should be used?

A - Enter a sampling scheme

B - Inspection Stage Change

C - Multiple Samples

D - All of the above

Answer : B

Explanation

By setting the indicator "No stage change" you can prevent an inspection stage change from taking place. This means that the sample size will not be dynamically modified.

Q 6 - Which of the following Transaction code is used to create an Inspection Plan?

A - QS21

B - QS31

C - QDV1

D - QP01

Answer : D

Q 7 - What is the standard SAP QM notification type to record a complaint against vendor and take action for the incoming material?

A - Q1

B - Q2

C - Q3

D - Not Defined

Answer : B

Explanation

You can use standard SAP QM notification type Q2 to record a complaint against vendor and take action for the incoming material.

Q 8 - Which of the following Transaction code is used for scheduling UD for Production lot?

A - QA39

B - QA40

C - QA41

D - QA42

Answer : C

Q 9 - If you want to display Quality Management standard forms, which of the following can be used?

A - QCCF

B - QCCM

C - QCCN

D - None of the above

Answer : A

Q 10 - Which of the following module is integrated with QM to manage the costs for defect control and non-confirmative costs in production process?

A - SAP Material Management

B - SAP Production Planning

C - SAP Sales and Distribution

D - SAP Controlling

Answer : D

Explanation

You can integrate SAP QM with controlling process to manage the costs for defect control and nonconfirmative costs in production process.

sap_qm_questions_answers.htm
Advertisements